#209 2750 Olalla Road, West Kelowna, British Columbia, V1Z2A9
Built In:
2024
List Date:
January 30th, 2023
Finished Area:
1260 sqft
Development Name:
Lakeview Villiage
Neighbourhood:
Lakeview Heights
Zoning:
Residential apartment
View:
Lake view, Mountain view, View, Valley view
Amenities Nearby:
Quiet Area
Property Specifications
Welcome to the incredible Lakeview Village, a quiet community with dazzling lakeviews and stunning scenery. This is an ASSIGNMENT SALE. C13 Floor plan is under construction and The Developer anticipates that construction of Phase 1 and Phase 2 will be complete and the strata plans for Phase 1 and Phase 2 will be registered in the Land Title Office between December 20, 2024 and March 20, 2025. This spacious 1260 sq ft condo has 2 gorgeous bedrooms and a spacious office/den. The 500 sq foot patio begs for morning coffee and for entertaining and enjoying. Included is fridge, gas range, microwave, hood, vent, stacked washer and dryer, dishwasher and roller blind window coverings. 2 Parking spots and 2 storage units are included! (id:43014)
Property Description
Bedrooms:
2
Bathrooms:
2
Air Conditioning:
Central air conditioning
Heating Type:
Forced air, In Floor Heating
Heating Fuel:
Electric, Natural gas
Interior Features
Ownership Type:
Condominium/Strata
Water Service:
Municipal water
Garage / Parking Type:
Underground
Pool:
Outdoor pool
Pool Features:
Heated pool
Building Amenities:
Exercise Centre, Secured Parking
Building Features
Storeys:
1
Square Footage:
1260 sqft
Rooms:
Main level
Bedroom
10 ft x 10 ft
Den
9 ft x 9 ft
Full bathroom
7 ft x 7 ft
Kitchen
11 ft x 10 ft
Living room
10 ft x 15 ft
Other
20 ft x 25 ft
Primary Bedroom
11 ft, 1 in x 11 ft, 1 in
Floors
Neighbourhood Details
View On Map
Interested?
Contact us for more information.
Agent: Nikki Harrison | Office: Fair Realty (Kelowna)
Welcome to the incredible Lakeview Village, a quiet community with dazzling lakeviews and stunning scenery. This is an ASSIGNMENT SALE. C13 Floor plan is under construction and The Developer anticipates that construction of Phase 1 and Phase 2 will be complete...